JUST COMPLETED!  LUXOR LAS VEGAS

The Tropicana was in a desperate situation with their two large fire tube water boilers that service the majority of the property. These boilers were operating below 70% efficiency. The boilers were only 10 years old and were experiencing multiple boiler tube failures and burner damage each year costing hundreds of thousands of dollars in repairs and lost revenue due to hot water shortages to the guest rooms.

TROPICANA

Centennial Hills Hospital had operated (2) two Cleaver Brooks 300 HP Flextime Boilers with Surefire burners supported with FGR since 2007.  When the Department of Air Quality Management reviewed their operating permit, it was determined that the existing burners could not satisfy the mission limits.  Read more in the following case study.

CENTENNIAL HILLS HOSPITAL

The recently re-designed Hoover Dam Lodge including replacing two old 1.7 mmbtuh atmospheric domestic water heating boilers with three .75 mmbtuh condensing units. Utilizing  both propane the fuel helped the building realize savings and exceed expectations.

HOOVER DAM LODGE

UMC BOILER UPGRADES

Projects

University Medical Center had a need to replace most of their heating and domestic water boilers. As part of an Energy Conservation Project developed by AMERESCO the total energy savings from all plant upgrades, which included lighting, controls, high-efficiency motors, VFDs, new boilers and pumps, made the boiler upgrades possible. Four of the old boilers had already failed and five others had burners needing replacement. CO emissions from 5 of the existing boilers tested were over 1500 ppm.